Earned Value & Earned Time
The Practitioner's Manual for Cost and Schedule Performance
Normalerweise in 3-5 Werktagen gedruckt
Earned Value & Earned Time is a practitioner's manual for cost and schedule performance. It teaches Earned Value Management the way it works inside Primavera P6, then adds the two measures that turn performance back into time: Earned Schedule and path-based Earned Time Management (ETM) for the paths that decide the finish. Inside: cost-loaded baselines and earning rules, EAC ranges and variance reports that lead to action, float erosion, risk-adjusted forecasts, DCMA and BEI checks, KPI dashboards in Power BI and Tableau, AI with guardrails, and the ControlsIQ platform — worked across six fictional sandbox projects in data centers, federal buildings, rail, aviation, and water and IT. Includes the Variance Analysis Report (VAR) template and the ETM Path Worksheet. The PDF edition is free with this hardcover — email your Lulu receipt to [email protected] to receive it.
Details
- Veröffentlicht am
- Oct 14, 2026
- Sprache
- English
- Kategorie
- Business & Wirtschaft
- Copyright
- Alle Rechte vorbehalten - Standard-Urheberrechtslizenz
- Autoren/Mitwirkende
- Von (Autor): P6 Project Controls
Spezifikationen
- Seiten
- 146
- Bindung
- Hardcover Hardcover
- Farbe für den Innenteil des Buches
- Farbe
- Abmessungen
- US Brief (8,5 x 11 Zoll / 216 x 279 mm)