Earned Value & Earned Time

Earned Value & Earned Time

The Practitioner's Manual for Cost and Schedule Performance

ParP6 Project Controls

Habituellement imprimé en 3-5 jours ouvrés
Earned Value & Earned Time is a practitioner's manual for cost and schedule performance. It teaches Earned Value Management the way it works inside Primavera P6, then adds the two measures that turn performance back into time: Earned Schedule and path-based Earned Time Management (ETM) for the paths that decide the finish. Inside: cost-loaded baselines and earning rules, EAC ranges and variance reports that lead to action, float erosion, risk-adjusted forecasts, DCMA and BEI checks, KPI dashboards in Power BI and Tableau, AI with guardrails, and the ControlsIQ platform — worked across six fictional sandbox projects in data centers, federal buildings, rail, aviation, and water and IT. Includes the Variance Analysis Report (VAR) template and the ETM Path Worksheet. The PDF edition is free with this hardcover — email your Lulu receipt to [email protected] to receive it.

Détails

Date de publication
Oct 14, 2026
Langue
English
Catégorie
Commerce & économie
Copyright
Tous droits réservés - Licence de copyright standard
Contributeurs
Par (auteur): P6 Project Controls

Caractéristiques

Pages
146
Type de reliure
Livre à couverture rigide Livre à couverture rigide
Couleur de l’intérieur
Couleur
Dimensions
Lettre US (8,5 x 11 po / 216 x 279 mm)

Notes & Avis