Earned Value & Earned Time

Earned Value & Earned Time

The Practitioner's Manual for Cost and Schedule Performance

DiP6 Project Controls

Di solito viene stampato in 3-5 giorni lavorativi
Earned Value & Earned Time is a practitioner's manual for cost and schedule performance. It teaches Earned Value Management the way it works inside Primavera P6, then adds the two measures that turn performance back into time: Earned Schedule and path-based Earned Time Management (ETM) for the paths that decide the finish. Inside: cost-loaded baselines and earning rules, EAC ranges and variance reports that lead to action, float erosion, risk-adjusted forecasts, DCMA and BEI checks, KPI dashboards in Power BI and Tableau, AI with guardrails, and the ControlsIQ platform — worked across six fictional sandbox projects in data centers, federal buildings, rail, aviation, and water and IT. Includes the Variance Analysis Report (VAR) template and the ETM Path Worksheet. The PDF edition is free with this hardcover — email your Lulu receipt to [email protected] to receive it.

Dettagli

Data di pubblicazione
Oct 14, 2026
Lingua
English
Categoria
Affari e Economia
Copyright
Tutti i diritti riservati - Licenza di copyright standard
Collaboratori
Di (autore): P6 Project Controls

Specifiche

Pagine
146
Tipo di rilegatura
Copertina rigida Copertina rigida
Colore del contenuto
Colore
Dimensioni
Lettera US (216 x 279 mm)

Recensioni e Valutazioni